About Us General Contracting Residential Contracting Single-Ply Roofing Portfolio Contact Us
 


Portfolio

Wells Fargo Bank

205 West Aurora Street
Ironwood, Michigan 49938
906-392-1620

 

Project Description

In 1992, Wayne Nasi Construction was hired to install a Duro-Last roofing system over the branch office and in 1995 Wayne Nasi Construction was hired to install a Duro-Last roofing system over the main office. Both roofs had a layer of two inch insulation installed over the existing hot tar roofing systems.

Reference

"Wells Fargo Bank has Duro-Last roofs on both our main and branch bank offices. Wayne Nasi Construction installed both roofs in 1995. We have been very satisfied with the quality of the roofs and the quality of service Wayne Nasi Construction provides. They completed the work in a timely and professional manner, answered all our questions about the Duro-Last roofing system, and encouraged us to see the project during the various stages of construction. We highly recommend both the Duro-Last roofing system and Wayne Nasi Construction."

James R. Milakovich
Vice President