Phillips Plastics Corporation
Insert Molding
2930 Mondovi Road
Eau Claire, Wisconsin 54701
Project Description
The existing standing seam metal roof was covered in 2001 with a new custom prefabricated Duro-Last roofing system. Precut EPS insulation fillers were installed inside the metal ribs and a layer of insulation was installed to create a flat surface for the new Duro-Last roofing system. The increased r-value reduced the heat loss and ice build-up on the roof.
Reference
"The look of the building has been enhanced. The addition of three inches of EPS insulation has noticeably reduced the heat gain in the building when the sun shines. It is a pleasure not to have leaks in the roof when it rains."
Gary Brzozowski
Maintenance Director
|