 |
|
Mellen School
420 South Main Street
Mellen, Wisconsin 54546
715-274-3601
Project Description
Wayne Nasi Construction was awarded the $500,000 Building Works Contract for the addition and remodeling project completed in 1994. This included all concrete work; rough and finish carpentry; installation of doors, frames, and hardware; and installation of most of the building specialties. Duro-Last roof ing systems were also installed on the Mellen school. In 1998, before the Duro-Last roofing system was installed on the 11,000 square foot gym roof, the entire roof had to be removed including the tectum decking. Twenty percent of the 5" x 9" wood perlins were replaced because of cracks and a new acoustic steel deck was installed with 4" of polyisocyanurate insulation. In 1999, 12,000 square feet of the Duro-Last roofing system was installed over the remaining flat roof sections of the school.
Reference
"During the construction of this project, Wayne Nasi Construction proved themselves over and over again to be a very competent and reliable construction company. The project superintendent, and his workers produced a finished product of the highest quality and cooperated in bringing this project in on time and within budget. In conclusion, I can recommend Wayne Nasi Construction without reservations."
James Harrington
PMSI (Professional Management Services, Inc.)
|
|
 |