Nicolet Area Technical College
PO Box 518
Rhinelander, Wisconsin 54501
715-365-4410
Project Description
The new custom prefabricated Duro-Last roofing system was installed over the existing metal roof in October of 1997 on the Maintenance Building. Precut EPS insulation fillers were installed inside the metal ribs and a layer of insulation was installed to create a flat surface for the new Duro-Last roof system. The increased r-value reduced the heat loss and ice build-up on the roof.
Reference
"We were extremely pleased with the professional manner in which this project was handled, from their willingness to assist us in preparing specifications to the actual installation. Wayne Nasi Construction's commitment and ability was outstanding.
The project was completed within the specified time line, and the installation crew was a pleasure to work with. Their patience in explaining the installation process, step by step, was beneficial in understanding how the system works.
I would highly recommend Wayne Nasi Construction to install your Duro-Last roofing system and look forward to working with them on future projects."
Charles Smith
Assistant Director of Facilities
|